Concrete floor cracking explained by John McLoughlin

I am a Degree Qualified, FEMA, ASHI & Certified Insurance Inspector with over 30 years of global experience in construction & building Inspection.

 
   

Many builders and Realtors in Florida when asked by clients about floor cracks often state that cracking of the concrete floors is common. Unfortunately this is true but it is generally caused by poor construction management rather than a natural occurrence. Most properties now built in Central Florida are built upon a solid concrete slab and foundation called a Monolithic slab and the speed and drying process is unfortunately not the most important consideration to many builders. Many people are actually unaware that the floor beneath them has cracks inviting a selection of problems over a period of time. If you have flexible floor coverings such as carpet, wood or vinyl you probably will never know until you get a structural defect, moisture or insect problems. If you have a non flexible floor covering such as tile and you have concrete cracking you will know very soon after the tile has been installed.

As you can see on the photo below when the concrete slab starts cracking it can have a detrimental effect on the floor finish and also contribute to further damage and possibly Mold. The crack starts as a hair line on the tile surface and then over a period of time becomes deeper and wider. The crack in the photo below spanned 20ft in length across a living room floor.

Concrete Floor Cracking

The concrete slab and foundation of the property is the most important part of the structure and it is essential that the construction management process is carefully monitored to ensure defects are not built into the design. Generally a monolithic slab is used which is a solid mass of concrete composing of the supporting foundation and ground floor. The exterior perimeter of the slab will form the foundation and will be thicker in order to support the weight of the exterior load bearing wall. The foundation or commonly known as “the footer” will have additional steel reinforcement bars placed within the concrete.

Concrete is a carefully measured quantity of cement, sand, rock aggregate and water. The strength of concrete is determined by the mixture ratio and is often based on the primary requirement for the structure and the load bearing requirements.

As concrete sets, the water in the mixture forms a chemical reaction with the cement; although the concrete dries in a sense that no liquid water remains the water is still there and is a very important element of the structure. The drying or setting of concrete is normally known as the Curing. In fact it is more important to keep the concrete wet during the early stages of curing. This is because of  the chemical reaction produced called Hydration which is the generation of heat produced in the curing process, while bonding the raw materials of the concrete together. The heat that is self generated by this process together with the ambient temperature and direct exposure to the sun can cause the concrete to have what is known as accelerated drying causing expansion cracks to appear on the surface and often run deeper into the concrete slab.

Common damage caused by concrete floor cracking

  • Poor structural integrity of the structure
  • Increased moisture & Mold
  • Termites & other insects
  • Uneven surfaces
  • Floor tiles cracking
  • Uneven wear on carpets & vinyl

How to reduce or prevent concrete floor cracking

Prevention is the best cure, it is important to try and reduce the accelerated drying process as the excessive heat will prevent the natural bonding together of the raw materials and cause the concrete to crack becoming weaker. A heat reduction process can be as simple as covering the concrete reducing the sun’s exposure but the most effective method is spraying the concrete with a fine mist or water when the surface has become hard to touch. Ideally 7 days would be a satisfactory time to leave the concrete before building upon it. Unfortunately I often see contractors in Florida building on it after just 24 hours. The stress produced on the concrete at this stage will defiantly produce cracking and effect the structural integrity of the structure.

Expansion joints should be cut into the concrete as soon as it has been set to allow for the continuous movement from expansion and contraction generated by the heat. The joints should be spaced correctly to be effective and they should be no more than 2-3 times the slab thickness (in inches). Therefore a 4 inch slab should have joints 8 -12 feet apart. The joints should be cut 25% of the depth of the slab; therefore a 4 inch slab would have joints cut 1 inch deep. In hot weather the concrete will crack if the joints are not cut within 6 -12 hours after finishing the concrete pour. Once the joint is cut a material with less density than the concrete can be inserted as an expansion joint material. Specialist joints can also be used which is basically a plastic or aluminum type material which is in the shape of a V inserted into the cut joint. When the expansion occurs the V section will compress indicated on the sketch below.

Remedies to existing concrete floor cracking

The remedies depend on how advanced the construction process is. If the structure is still at the exposed floor stage it can be as simple as cutting into the concrete using diamond cutting machines, cutting continuous slot expansion joints and placing either a joint material or compressed joint fixing. Provided the expansion joints have been installed within the space parameters the cracking will stop or be considerably reduced.

If the floor surface has a tile finish it is best to wait at least 90 days after the cracks are fully identified to determine the extend and direction the cracks will take. If the crack has already become visible through the tiles it is probably a depth equal to the floor slab thickness and very little can be done to correct this apart from apply a sealant into the crack to help prevent moisture intrusion and insect control. Unfortunately at this stage it can become more costly as the tiles at least 18” either side of the crack will have to be removed. When the crack has been fully exposed it is recommended that a diamond cutting machine is used to cut an expansion joint using the crack line as point of direction. A flexible jointing compound or sealant should be used as the expansion material and left to set. When set a single strip of felt or thin shingle should be laid on top of the crack to allow for movement with the tiles placed above it.

If you have a property that has severe concrete cracking or floor tiles cracked it could still be covered under your builder’s home warranty and it is advisable to have an inspection carried out before it is covered.

 
  Home Inspection areas covered  
    I am based in Windermere Florida and cover the whole of Central Florida coast to coast for all of the following inspections:
  • Home Inspection
  • Pool inspection
  • New construction inspection
  • Pre inspection
  • Roof inspection
  • 4 point inspection
 
   

My full credentials and qualifications can also be verified online by reviewing my web page www.homeinspectionforyou.com or by contacting The American Society of Home Inspectors (ASHI) www.ashi.org, The Chartered Institute of Building (CIOB) www.ciob.org.uk and The Association of Building Engineers, (ABE) www.abe.org.uk

 
   
John has carried out several inspections for my agency, assisting my clients and staff to gain insurance through a professional inspection. I have recommended John to other State Farm agencies that are also now using his service.
Tony Lopez. State Farm Insurance Orlando
 
   
John McLoughlin, providing Assurance to the Housing industry.
407 666 3279
www.homeinspectionforyou.com

 

HOME INSPECTION SERVICES
 

HOME INSPECTIONS
British Chartered Surveyor & ASHI Home InspectorServing Central Florida www.homeinspectionforyou.com

Member of The British American Chamber of commerce
www.britishamericanchamberorlando.com

For your Home Inspections anywhere in central Florida including Windermere, Winter Garden, Ocoee, Gotha, Oakland, Winter Park, Maitland, Altamonte Springs, Apopka, Longwood, Casselberry, Sanford, Oviedo, Winter Springs, Lake Mary, Kissimmee and Celebration.  With just a sample of the leading areas such as Isleworth, Bay Hill, Lake Butler Sound, Keene’s Point, Belmere Reserve, Horizon West, Summerport, Independence, Dr. Phillips, Viscaya, Metrowest, Baldwin Park, College Park, Thornton Park, Lake Eola, Colonial Town, Delaney Park, Audobon Park, Conway, Heathrow, Avalon Park, Waterford Lakes, Lake Nona, Alaqua, Hunters Creek and Reunion.

 
HOME | CONTACT | CONSUMER LINKS | SITE MAP
 
Site Map
 
ABE ASHI ASHI Standards BACC Buy Report Caveat Emptor CIOB Concrete Floor cracking Contact Consumer Links Common Defects Costs & Payments Currency Exchange advise Currency Exchange Foreclosure Inspections Home Home Inspections Home Inspection Areas Home Inspection Schedule Home Watch Inspection Schedule Insurance Inspections Life Expectancies New Construction Inspection Schedule ORRA Pool Inspection Pre Inspection Pre Inspection Schedule Qualifications Roof Inspection Schedule Services Service Agreement Settlement Cracks Schedule Inspection Termites Terms The Inspection WDO Inspections Wood Rot Why use my services 4 Point Inspections 4 Point Inspection Schedule